The Chang GREEN C3 laboratory is located in Wegner Building 119 at Washington State University. The laboratory has solution chemical synthesis capabilities (two chemical hoods), electrochemical characterization and in-situ characterization equipment. The shared facility in Wegner Hall includes in-situ XRD, Raman and mass spectrometry.
Fan Oven
Vacuum Oven
Oven
Pine RDE
Electrochemical working station
Electrochemical working station
In-situ FTIR
In-situ Raman
In-situ IR and MS for battery
Booster
2 * GCs
UV-VIS
Analytical Balance
Sonicator
Millipore Water
Tube furnace
Flow meters